Figure 1-1: Study Area
Figure 3-1: Existing Roadway Classifications
Figure 3-2: Walkway Inventory
Figure 3-3: Bikeway Inventory
Figure 4-1: 2002 Average Daily Traffic Volumes
Figure 4-2: 2002 PM Peak Hour Traffic Volumes
Figure 4-3: Existing Intersection Operations
Figure 4.4: High Accident Locations
Figure 5-1: TAZ MAP
Figure 5-2: Expected Future Growth Pattern
Figure 5-3: Screenline Analysis Summary
Figure 5-4: Assigned Link Volumes Analysis
Figure 5-5: 2022 PM Peak Hour Traffic Volumes
Figure 5-6: Intersection Operations 2022 No Build
Figure 6-1a: Roadway Modernization Projects (Capacity Driven)
Figure 6-1b: Roadway Modernization Projects (Non-capacity Driven)
Figure 6-2: Recommended Intersection Improvements
Figure 6-3: New Roads or Road Extension Projects
Figure 6-4: Pedestrian and Bicycle Projects
Figure 6-5: Railroad Improvement Projects
Figure 6-6a: Freeway Interchange Options
Figure 6-6b: Freeway Interchange Options
Figure 6-6c: Freeway Interchange Options
Figure 6-7: Seltice Way - Mullan Avenue Couplet Option
Figure 6-8: Mullen/Spokane Turn Movement Restrictions
Figure 6-9: Seltice Way-Idaho Street Circulation Project
Figure 6-10: Seltice Way Access Management and Consolidation Option
Figure 6-11: Centennial Trail-Seltice Way Crossing Options
Figure 6-12: Freeway Improvement Options
Figure 6-13: Greensferry Road Overpass
Figure 6-14: Greensferry Road Single-Point Urban Interchange Option
Figure 6-15: Seltice Way-4th Avenue Interchange Option
Figure 6-16: Split Diamond Interchange Option
Figure 6-17: Potential Long-Term Projects
Figure 7-1: Proposed Roadway Classifications
Figure 7-2a: Typical Street Sections (Locals)
Figure 7-2b: Typical Street Sections (Collectors)
Figure 7-2c: Typical Street Sections (Minor Arterial)
Figure 7-2d: Typical Street Sections (Principal Arterial)
Figure 7-2e: Typical Street Sections (Arterials)
Figure 7-3: Intersection Sight Distance
Figure 7-4: Recommended Bicycle Plan
Figure 7-5: Recommended Pedestrian Plan
Figure 7-6: Recommended Truck Routes
|